Day Two – Thursday February 24

After day one, Brenda and I got home late in the evening after they had left. The garage was clean, their tools were neatly stacked to the side and I was a happy camper.

I stopped by at lunch on day two and the panels were back up on the roof, they were finalizing pulling the wire and connecting/moving our critical load to the new sub-panel, and they were making good progress.

Everything was completed by the end of the day. Except… the system was not connecting to our WiFi router. They tried a booster, but it didn’t cut it. So on to Plan B.